
New TopShim run:

version = topshim 2.4.0
date = 2024-09-03
time = 18:07:06.212
command = topshim  convcomp tuneaxyz

FINE SHIMMING

Parameters:

probe = Z116098_0395
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 13C
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Iteration  1: FWHM Before= 3.9 Hz, Target= 0.6 Hz, After= 0.5 Hz
Iteration  2: FWHM Before= 0.5 Hz, Target= 0.3 Hz, After= 0.7 Hz
Iteration  3: FWHM Before= 0.7 Hz, Target= 0.7 Hz, After= 0.7 Hz
Iteration  4: FWHM Before= 0.7 Hz, Target= 0.7 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.859


Performing tune after shimming
tune lock level increase = 1.3

shim changes: 
Z	-75
Z2	-80
Z3	-21
Z4	-341
Z5	+226
X	-52
Y	+171

duration = 2 min 52 sec
completed successfully
finished Tue Sep  3 18:09:56 2024


========================================================================
